HomeReno Cost

Australia calculator

Deck Building Cost Calculator

Estimate the cost to build a new deck in Australia. Adjust the deck size, the decking material, whether it is ground-level or raised, and whether you add a perimeter balustrade and a stair run to see an itemised low–high range in Australian dollars (GST inclusive) per square metre for your project.

How this calculator is built

Unit costs with sources

This model cites 5 sources across line-item unit costs, regional labor data, and tax references.

Regional labor adjustment

The state table applies local labor indexes only to labor-heavy line items.

Published methodology

The methodology page lists the formula, size drivers, labor model, and source links.

Estimate your project

Change the default inputs to match your scope. The breakdown updates by line item.

Adjust your project

Estimated cost

$10,948$18,246

Typical range for the options you selected.

Itemized cost breakdown
ItemEstimate
Substructure (footings, beams & joists)$1,800
Decking boards$5,100
Build labor$2,640
Railing$3,730
Subtotal$13,270
VAT (10%)$1,327
Total inc. VAT$14,597

Deck Building Cost by state: typical ranges

Each range applies that state's labor index to the labor-share line items of the default project; materials stay at national prices. Select a state for its full local breakdown and calculator.

Typical deck building cost by state, default configuration
StateTypical rangeLabor indexPermit
Australian Capital Territory$10,998–$18,331101%Usually none
New South Wales$11,035–$18,392102%Usually none
Northern Territory$10,694–$17,82495%Usually none
Queensland$10,768–$17,94796%Usually none
South Australia$10,713–$17,85595%Usually none
Tasmania$10,243–$17,07185%Usually none
Victoria$10,869–$18,11698%Usually none
Western Australia$11,376–$18,960109%Usually none

Common questions

How much does it cost to build a deck in Australia?

Supplied and installed, treated pine runs about $200–$280 per m², hardwood about $300–$400 per m², and composite about $350–$550 per m², with a separately priced balustrade at $250–$600 per lin m — so a mid-grade 30 m² hardwood or composite deck with a timber balustrade lands around $13,000–$16,000. Prices shown are GST inclusive.

Is composite decking worth it over timber in Australia?

Composite costs more up front — often 30–50% above treated pine — but resists the termites, splitting, and greying that plague timber, and needs no annual oiling, which matters in Australia's harsh UV and humid north. Treated pine is cheapest to install; capped composite sits at the top. The 'Decking material' selector scales the estimate across these tiers.

Do I need approval to build a deck in Australia?

A low ground-level deck is often exempt development needing no approval, but a raised deck, one attached to the dwelling, or a deck in a bushfire-prone (BAL) or flood area usually needs building approval from a private certifier or council. Toggle 'Raised / elevated deck' and 'Include a stair run' to reflect the extra structure, and check whether a bushfire rating applies to your site.